Repair Update – 7/24/2017

Well we got through the most inconvenient part of the repair.  All the steel sheets are in place and they’ll be installing the anchors for the next couple weeks.  Anchors are drilled 75 feet into the hillside.  The road is passable during this time.

Full day road closures through mid-July
Full day road closures through mid-July
Steel sheet pile is vibrated in
Steel sheet pile is vibrated in
75' anchors hold sheet pile in place
75′ anchors hold sheet pile in place

 