Slide Repair at .4 mile

Repair of the landslide at .4 mile is mostly complete.  When we start to get some rain the commissioners will plant willows for erosion control.

The turnout at the slide will not be repaired but a new turnout was created a few feet downstream of the slide area.

LSRD Slide Repair in progress
LSRD Slide Repair in progress

Asphalt was cut back so the undercut could be filled in with rock.

LSRD Slide Repair -bank filled in
LSRD Slide Repair -bank filled in

Fabric and root balls were placed at the base of the repair.

LSRD Slide Repair - fabric and root balls used
LSRD Slide Repair – fabric and root balls used at the base
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s